FRANCE, ALIZEY. Double A Paper mill PERFORMED INSULATION WORKS Insulation of boiler, ducts, piping, equipments and scaffolding works 2019-2020. Scope of the work ca 2200 m2
FINLAND, KAUHAJOKI PERFORMED INSULATION WORKS Insulation of boiler, electric filter, ducts, piping, equipments and scaffolding works 2019-2020. Scope of the work ca 2000 m2
FINLAND, ESPOO Fortum in Kivenlahti PERFORMED INSULATION WORKS Insulation of boiler, electric filter, ducts, piping, equipments and scaffolding works 2019-2020. Scope of the work ca 5000 m2.
FRANCE, TARASCON Fibre Excellence Tarascon PERFORMED INSULATION WORKS Insulation of electric filter, ducts, equipments and scaffolding works 2019. Scope of the work ca 2500 m2
ESTONIA, SILLAMÄE EuroChem Terminal PERFORMED INSULATION WORKS Cold Insulation of piping and equipments 2019. Scope of the work ca 10 000 m2.
NORWAY, VESTBY PERFORMED INSULATION WORKS Insulation of piping, ducts and equipments and scaffolding works 2019. Scope of the work ca 2800 m2
PORTUGAL, FIGUEIRA DA FOZ PERFORMED INSULATION WORKS Celulose Beira Industrial pulp mill. Insulation of boiler, piping and equipments 2018-2019. Scope of the work ca 17 000 m2
SWEDEN, GRUMS. Gruvön Mill PERFORMED INSULATION WORKS Insulation of piping and equipment’s 2018. The scope of the work ca 20.000 m2.
FINLAND. VIERUMÄKI PERFORMED INSULATION WORKS Wersowood sawmill and glulam factory. Insulation of the boiler, ducts, pipelines and equipment in 2018. Scope of the work ca 800 m2
DENMARK, COPENHAGEN. Hofors Energi Power Station PERFORMED INSULATION WORKS Insulation of piping, ducts and equipments 2018-2019. Scope of the work ca 9000 m2