ENGLAND. LOW MARNHAM. COMBINED HEAT & POWER (CHP) PLANT (AET). PERFORMED INSULATION WORKS Insulation of boiler, piping and equipments 2017. The scope of the work ca 8.000 m2.
FINLAND. TURKU. Biomass-fired power plant PERFORMED INSULATION WORKS Insulation of boiler, piping and equipment 2017. The scope of the work ca 3.000 m2.
SWEDEN. NYBOHOLM. 8 MWth Biograte steam boiler plant PERFORMED INSULATION WORKS Insulation of boiler piping and equipment’s 2017. The scope of the work ca 3.200 m2
FINLAND. IISALMI. 4,5 MWth Biograte boiler plant PERFORMED INSULATION WORKS Insulation of boiler piping and equipment’s 2017. The scope of the work ca 1.800 m2
FINLAND. NAANANTALI Thermal Power Plant (142 MW) PERFORMED INSULATION WORKS Insulation of piping and equipments 2017. Scope of the work ca 12.000 m2.
ESTONIA. AUVERE EESTI ENERGIA 2 x 300MW CBF PERFORMED INSULATION WORKS Power Plant. Technical insulation of boiler, piping and equipments 2016. Scope of the work ca 6 000m2
FINLAND SEINÄJOKI PERFORMED INSULATION WORKS Insulation of boiler, ducts, piping and equipments 2016. Scope of the work ca 4000 m2.
FINLAND KOKKOLA PERFORMED INSULATION WORKS Insulation of tanks and equipments 2016. Scope of the work ca 1500 m2.
FINLAND RAAHE PERFORMED INSULATION WORKS Insulation of boiler, ducts, piping and equipments 2015. Scope of the work ca 7500 m2.
SWEDEN SVAPPAVAARA PERFORMED INSULATION WORKS Insulation of piping and equipments 2015. Scope of the work ca 6.000 m2.